Global Sources
EE Times-India
Stay in touch with EE Times India
 
EE Times-India > Embedded
 
 
Embedded  

Get your app to market in 12 months

Posted: 11 Dec 2008     Print Version  Bookmark and Share

Keywords:Telecom infrastructure  COTS  pre-integrated system 

Telecom infrastructure development is moving into a third phase of infrastructure development: the shift to pre-integrated systems that include high availability middleware, protocol stacks, unified management, and hardware platforms. These systems offer a quick path to market since the equipment manufacturer develops only the application that runs on the system.

The first phase of infrastructure development had telecom equipment manufacturers (TEM) using a vertically-integrated approach. The second phase was marked by a shift to the commercial off the shelf (COTS) model where the individual blades and software modules are procured from different vendors and integrated together by the TEM. The desire for even quicker time-to-market has given rise to a third model, the pre-integrated system. These systems feature a comprehensive software stack built on a standards-based hardware platform, designed and tuned for particular network elements. This article discusses some strategies to ensure that the time-to-market advantage is preserved.

View the PDF document for more information.





Comment on "Get your app to market in 12 months"
Comments:  
*  You can enter [0] more charecters.
*Verify code:
 
 
Webinars

Seminars

Visit Asia Webinars to learn about the latest in technology and get practical design tips.

 

Go to top             Connect on Facebook      Follow us on Twitter      Follow us on Orkut

 
Back to Top